Holte Hall 3

ROOM

Wood-based construction for sports hall in the low-emission class

Holte Hall 3 is a new sports hall measuring 1,828 m² at Rudegaard Sports Complex in Holte, built for the Rudersdal Municipality.

Woodconstruction has designed its own supply and delivered and installed the load-bearing timber structure in collaboration with HPH Totalbyg.

The construction includes, among other things, 23-meter-long glued timber barriers and up to 9-meter-high pillars around the open hall for handball, volleyball and badminton.

The hall is constructed as a low-emission building with the goal of a maximum of 6.4 kg CO₂e/m²/year.

ROOM

ROOM